Software teams use "Definition of Ready" (DoR) and "Definition of Done" (DoD) as quality gates:
Definition of Ready: Criteria a backlog item must meet before work can begin (e.g., acceptance criteria defined, linked to ADR if architectural, effort estimated, decomposed if XL+).
Definition of Done: Criteria that must be satisfied before an item can move to `done`/`completed` (e.g., tests passing, validations run, documentation updated, PR merged).Design considerations
DoR/DoD should be configurable per-KB (in board.yaml or a dedicated config file).
Each criterion could be a checklist item (manual) or a reference to a programmatic validation (automated).
`sw_claim` could check DoR and warn/block if not met.
`sw_submit` or a review-approve tool could check DoD.
Agents benefit from seeing DoR at claim time and DoD at submit time — reduces rework.
Note: `sw_validate` as an MCP tool may be unnecessary — agents can run validation commands locally via pre-commit hooks and CI. The value is in surfacing _which_ validations apply to a given item (already handled by `sw_context_for_item`), not in executing them remotely.